ASO 7.69% 1.4¢ aston minerals limited

Ann: Commencement of Underground Drilling at Dobsina, page-3

  1. 666 Posts.
    lightbulb Created with Sketch. 35
    mmmm doesn't say refurb is complete.  Says it's still being refurbished:

    The available drill positions allow for the testing of mineralisation both within the Joremeny Adit which is presently being refurbished, and the Langengberg Adit, which is awaiting approval of permitting to commence refurbishment

    Semantics, but good to have correct information here.

    Cheers
 
watchlist Created with Sketch. Add ASO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.