Strandline expects to sell several shipments of Heavy Mineral Concentrate produced from the WCP while construction of the MSP is being completed.
Ore commissioning is now well underway, as shown by the growing stockpile of product ahead of our first shipment.
- Forums
- ASX - By Stock
- STA
- Ann: Commercial Production of HMC achieved at Coburn Project
Ann: Commercial Production of HMC achieved at Coburn Project, page-6
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NEWS
Is oil undervalued?
STA (ASX) Chart |
Day chart unavailable