Cedric stated at the AGM that an expansion up 1mtp is achievable with current infrastructure and minor revamp to 1.5 mtp
Also these are bolt on not all the plant is required again magnetic separation would be the restricted to name plate at the moment , but an extension to the ball mill may not be necessary
1mtpa is all that has been stated for this area next plat after will be fed by other ore supply