Ann 8th Jan - results IMMINENT.
They got the technology and just needed the machinery.
The machinery was for production, not for testing.
They are beyond test phase, that's why they set up machinery.
IMMINENT - how long is a piece of string?
waiting, waiting, waiting
am expecting good news, would be shocked to hear of any failure - a small setback at this stage would feel like a kick in the guts for sure
fingers still crossed, not as tightly though
Thankyou.
- Forums
- ASX - By Stock
- Ann: Commissioning of 68' long belt continuous kiln completed
Ann 8th Jan - results IMMINENT.They got the technology and just...
-
-
- There are more pages in this discussion • 93 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CFO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.468M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CFO (ASX) Chart |
Day chart unavailable