Producing CFOAM products at atmospheric pressure will result in a significant capability upgrade placing the company in an industry leading position. CFO along with Consol Energy is now concentrating its efforts to achieve the objectives of the DOE project that will result in a significant upgrade to current production.
This could fly with any good results from the kiln, I expect constant updates from now.
Looks like Consol Energy are really pushing this as they look for new ways to capitalise from coal.
- Forums
- ASX - By Stock
- CFO
- Ann: Commissioning of 68' long belt continuous kiln completed
Ann: Commissioning of 68' long belt continuous kiln completed, page-2
-
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CFO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.468M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CFO (ASX) Chart |
Day chart unavailable