The red flags continue. There is a fine line between battery grade and industrial grade lithium, but huge price difference. The pilot plant will struggle with grade/volume/cost. Unfortunately the pilot plant cannot give or project 2-3 years of production costs as maintenance is an unknown on all DLE systems, only by operating a system continuous for years can it be known. This probably wont get that far, its the battery grade they'll struggle with. The unknown third party isn't inspiring confidence. Eagerly awaiting figures from independent verification. GLTAH
- Forums
- ASX - By Stock
- Ann: Commissioning of Pilot Plant Completed at Prairie
The red flags continue. There is a fine line between battery...
-
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.7¢ |
Change
0.001(6.25%) |
Mkt cap ! $76.05M |
Open | High | Low | Value | Volume |
1.7¢ | 1.7¢ | 1.6¢ | $40.06K | 2.478M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
55 | 10062835 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 4654217 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
55 | 10062835 | 0.016 |
47 | 13122664 | 0.015 |
32 | 6780596 | 0.014 |
6 | 3245384 | 0.013 |
6 | 3322451 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 4654217 | 8 |
0.018 | 1777816 | 9 |
0.019 | 3143541 | 19 |
0.020 | 7264715 | 23 |
0.021 | 2308820 | 5 |
Last trade - 16.10pm 31/10/2024 (20 minute delay) ? |
Featured News
AZL (ASX) Chart |