Doing exactly what they said they would, on time, arguably even slightly ahead of time. They told us back here that “end spurt” was near and they were aiming to commission this in Sept, and here we are still with a fortnight of Aug left to run.
The ever-sniping, short-covering bears spend a lot of their bitter lives here spreading FUD, yet Vulcan just sails right over the top of them again and again.
- Forums
- ASX - By Stock
- VUL
- Ann: Commissioning start at Lithium Extraction Optimisation Plant
Ann: Commissioning start at Lithium Extraction Optimisation Plant, page-3
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.55 |
Change
0.230(5.32%) |
Mkt cap ! $856.2M |
Open | High | Low | Value | Volume |
$4.45 | $4.61 | $4.35 | $3.238M | 722.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 350 | $4.87 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.32 | 49 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1509 | 4.530 |
11 | 6824 | 4.520 |
4 | 3815 | 4.510 |
4 | 10732 | 4.500 |
3 | 950 | 4.490 |
Price($) | Vol. | No. |
---|---|---|
4.550 | 28857 | 8 |
4.560 | 5040 | 1 |
4.570 | 3000 | 1 |
4.580 | 23725 | 6 |
4.590 | 2110 | 2 |
Last trade - 15.59pm 27/09/2024 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |