"All commissioning personnel have been on-boarded and key technical personnel have transitioned to site base roles while commissioning activities accelerate.
The team includes senior Ebtec specialists who are on site (post a mandatory quarantine period) in preparation for the SOP Purification Plant commissioning.
The specialists’ scope encompasses training of
Kalium Lakes’ operations personnel to run the plant during commissioning and ramp-up, which will facilitate acceleration to the initial 100ktpa production target."
Perhaps there are more from the team coming over, however my interpretation was that they are already out of quarantine and on site.
I still call Sept production highly conservative... my long standing bet being July for first production.
- Forums
- ASX - By Stock
- KLL
- Ann: Commissioning Under Way At Beyondie SOP Project
Ann: Commissioning Under Way At Beyondie SOP Project, page-41
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable