A very interesting presentation. In page 14 they have a graph of the production ramp-up, showing a total of
934 tonnes produced until de end of October 2015.
The cumulative production can be regressed as a polynomial with an r2 of 99.6%.
At this ramp-up rate, they will reach full capacity in April 2017.
Cassandra
- Forums
- ASX - By Stock
- Ann: Company Presentation
A very interesting presentation. In page 14 they have a graph of...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)