COMPANY UPDATE
• Queensland Government Finally Issues Environmental Authority
for Mt Freda.
Tombola Gold Ltd (ASX: TBA) (the “Company”) wishes to advise after a lengthy approval process the
Queensland Government has finally issued the Environment Authority (EA) for the commencement
of the construction of the Mt Freda Gold Vat Leach and Carbon-in-Column processing facility and
associated mining activities.
The Gold processing plant (ASX: TBA 2nd August 2021), which consists of four 2 tonne Gold recovery
carbon columns, already completed and located within the process facility bund wall. The entire
processing plant has been manufactured off-site and will be assembled on-site with only the
cyanide and caustic soda handling and mixing circuit (now completed) to be installed mid/late
January.
Construction of the two 40,000 tonne re-useable Leach Vats for Mt Freda is now well under
construction together with the Pregnant Liquor Solution (PLS) and Barren Liquor Solution (BLS)
ponds (ASX: TBA 2nd August 2021). The Gold processing plant will operate at 150,000 liters of
solution per hour via four 2 tonne activated carbon columns. The Gold processing plant will initially
commence production of approximately 300,000 tonnes of Gold mineral resource per year with a
forecast Gold production of 57,300 ounces of Gold over 3 years with a net margin of $63.7 million
over the three years (ASX: TBA 26th July 2021) with drilling to continue to expand the life of mine.
- Forums
- ASX - By Stock
- TBA
- Ann: Company Update
Ann: Company Update, page-2
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBA (ASX) to my watchlist
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.12M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TBA (ASX) Chart |
Day chart unavailable