Compelling New Drill Targets Identified From
Geophysical Surveys at the Lachlan Project, NSW
Priority chargeable and conductive anomalies identified in areas known to host base
and precious metal mineralisation; Drilling to be expedited in Q2/Q3 2023
Management Comment
Talisman’s CEO, Shaun Vokes, said: “Our concurrent work streams of drilling, geophysics and
geochemistry are starting to bear fruit in NSW. The identification of the priority Stella and Rip and
Tear geophysical targets represents an excellent outcome from our systematic and methodical
greenfields exploration approach.
“We are looking forward to receiving regulatory approvals and drilling both targets as soon as
possible.”
Exciting times...
...
- Forums
- ASX - By Stock
- TLM
- Ann: Compelling New Drill Targets at Lachlan Project
Ann: Compelling New Drill Targets at Lachlan Project, page-2
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLM (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.0¢ |
Change
0.005(1.82%) |
Mkt cap ! $52.73M |
Open | High | Low | Value | Volume |
28.0¢ | 29.0¢ | 27.0¢ | $119.2K | 428.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 471222 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.0¢ | 149076 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 471222 | 0.270 |
2 | 20041 | 0.265 |
2 | 71000 | 0.260 |
1 | 200000 | 0.255 |
2 | 30000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.280 | 149076 | 1 |
0.285 | 13490 | 1 |
0.290 | 60672 | 2 |
0.295 | 52600 | 2 |
0.300 | 225032 | 6 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
28.0¢ |
  |
Change
0.005 ( 3.70 %) |
|||
Open | High | Low | Volume | ||
27.0¢ | 28.0¢ | 27.0¢ | 96168 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
TLM (ASX) Chart |