HZR 2.13% 48.0¢ hazer group limited

Keep in mind that the CDP is built as a permanent facility and...

  1. 301 Posts.
    lightbulb Created with Sketch. 34
    Keep in mind that the CDP is built as a permanent facility and will produce roughly $0.75M of electricity per annum at $0.25/kwhr for use by the sewage treatment plant/net feed in to the grid. If the graphite is worth $2K/tonne, then there's another $0.75M or so in graphite. You'd hope that they keep it running until a major renewal is required or a second gen larger more economic CDP is worth taking all the sewage digestor's methane.
 
watchlist Created with Sketch. Add HZR (ASX) to my watchlist
(20min delay)
Last
48.0¢
Change
0.010(2.13%)
Mkt cap ! $110.4M
Open High Low Value Volume
48.0¢ 48.5¢ 47.5¢ $95.46K 198.9K

Buyers (Bids)

No. Vol. Price($)
1 360 48.0¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 10000 1
View Market Depth
Last trade - 16.10pm 28/05/2024 (20 minute delay) ?
Last
48.0¢
  Change
0.010 ( 2.13 %)
Open High Low Volume
48.5¢ 48.5¢ 47.5¢ 11370
Last updated 15.27pm 28/05/2024 ?
HZR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.