Recent drilling has acquired enough representative material to determine design constraints on what apeears to be a low grade but massive deposit.
Hopefully they will be able to demonstrate a credible and robust pathway (and provide the approximate cost) to produce zinc etc from this deposit. If economic and robust in the face of lower prices this may be enough to attract the interest of a major i.e S32 in which case could this could provide the salavation long suffering shareholders have endured.
However their long suffering shareholders need some spice in their lives. Having defined what is no doubt a world class low grade deposit surely now is the time to have a go at the feeder zones and explore the potential for high grade MVT deposits as you have promised for some years now.
Suffering shareholder
- Forums
- ASX - By Stock
- RTR
- Ann: Completion of Metallurgical Diamond Drilling at Earaheedy
Ann: Completion of Metallurgical Diamond Drilling at Earaheedy, page-4
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RTR (ASX) to my watchlist
|
|||||
Last
3.9¢ |
Change
0.002(5.41%) |
Mkt cap ! $29.50M |
Open | High | Low | Value | Volume |
3.8¢ | 3.9¢ | 3.6¢ | $43.99K | 1.162M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 258 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 647517 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 258 | 0.036 |
1 | 250000 | 0.035 |
3 | 32908 | 0.034 |
2 | 290000 | 0.033 |
8 | 427218 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 647517 | 1 |
0.040 | 420000 | 3 |
0.041 | 250000 | 1 |
0.042 | 217561 | 2 |
0.043 | 321000 | 2 |
Last trade - 16.10pm 08/08/2024 (20 minute delay) ? |
Featured News
RTR (ASX) Chart |