re: Ann: Completion of Rosewood Plantation 21...
Completion changes and Engineering Following mechanical problems which were encountered in the completion of both the Deshotels 20H and 13H wells and prevented them from realising their oil production potential, Pryme engaged an experienced engineering team to evaluate the past drilling and completion performance of the wells and determine a lower risk approach to the continuing development of the Turner Bayou project. As a result, a simpler and well-proven approach to completion of future wells has been adopted. Thisincludes running a slotted or perforated liner in the horizontal section of the well, not cementing it in place and avoiding the need to perforate the liner. “These changes, as well as the application of improved drilling technology to keep the lateral portion of the well within the target zone, should greatly increase oil recovery and reduce technical risk.” Said Ryan Messer, Pryme’s Executive Director & COO.