Between 2pm and 3pm yesterday there was a low volume sell down that was quickly bought up.
So a cap raise at 7.9 cents, benefaction plant = more ore to sell. And buying on market at 7.9 cents or 8.1 cents is pretty much as good as.... that money didn't pour in to get out at 8 cents odd. Also the recent sell down could be leaky ship knowing the deal was being done.
This is yesterday, note the time along the bottom is not daylight saving time so the day starts at 9am and ends at 3pm for me in QLD.
There's nothing in the way now, they got the dough, and they are highly motivated, their speed on this project has been amazing. The grades, well, I haven't personally seen anything like that, 67% Fe .... the infill drilling is 1m apart.... this is precision stuff to get exactly to the good stuff and pile up the other stuff for later.
- Forums
- ASX - By Stock
- Ann: Completion of Share Placement
Between 2pm and 3pm yesterday there was a low volume sell down...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TI1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.208M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TI1 (ASX) Chart |
Day chart unavailable