Outstanding metallurgical results demonstrate gold recoveries ofover96% through the leach
circuit at the RPM NorthDeposit;
oThe average head grade of the RPMmetallurgicalcomposite was1.34g/t Au. The overall
average tail grade achieved from thecomposite was less than0.15g/t Au.
Can someone explain the way the 96% recovery is calculated. I make if you start with 1.34g and leave .15g I make that 88.9%.
What am I missing?
- Forums
- ASX - By Stock
- NVA
- Ann: Concentrate Leach Recoveries of over 96% achieved at RPM
Ann: Concentrate Leach Recoveries of over 96% achieved at RPM, page-18
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
23.5¢ |
Change
-0.005(2.08%) |
Mkt cap ! $50.04M |
Open | High | Low | Value | Volume |
24.0¢ | 24.5¢ | 23.5¢ | $13.43K | 56.75K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 114011 | 23.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.5¢ | 37061 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 64012 | 0.235 |
5 | 135947 | 0.230 |
3 | 21800 | 0.225 |
6 | 92908 | 0.220 |
1 | 16175 | 0.215 |
Price($) | Vol. | No. |
---|---|---|
0.245 | 37061 | 2 |
0.250 | 5000 | 1 |
0.255 | 3930 | 1 |
0.265 | 1074555 | 4 |
0.270 | 19230 | 2 |
Last trade - 16.10pm 22/05/2024 (20 minute delay) ? |
|
|||||
Last
23.5¢ |
  |
Change
-0.005 ( 2.08 %) |
|||
Open | High | Low | Volume | ||
23.5¢ | 23.5¢ | 23.5¢ | 10620 | ||
Last updated 12.20pm 22/05/2024 ? |
Featured News
NVA (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online