• Thalanga Mill has been fully commissioned
• Production of copper, lead and zinc concentrate commenced on 8 September 2017
• Stoping commenced on 8 September with the firing of the first production stope
• First load of production ore delivered to the Thalanga ROM pad on 9 September
• The production restart has been achieved ahead of schedule and budget
- Forums
- ASX - By Stock
- RVR
- Ann: Concentrate Production Commences at Thalanga
Ann: Concentrate Production Commences at Thalanga, page-2
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RVR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online