• Thalanga Mill has been fully commissioned
• Production of copper, lead and zinc concentrate commenced on 8 September 2017
• Stoping commenced on 8 September with the firing of the first production stope
• First load of production ore delivered to the Thalanga ROM pad on 9 September
• The production restart has been achieved ahead of schedule and budget