Hi Meteor, We do need to careful that we are comparing apples to...

  1. 5,527 Posts.
    lightbulb Created with Sketch. 31
    Hi Meteor,

    We do need to careful that we are comparing apples to apples.
    I believe the figures from the April update were based on actual metals.
    The figures from the May update are about concentrates.

    From the May update and my calcs below:
    Copper concentrate production is exceeding forecast with an average grade of 24.2% copper @ 76.4% recovery, producing 1,047 dmt of concentrate.

    0.242 * 0.764 * 1047 = 193 tonnes of metal copper

    Lead concentrate production is exceeding forecast with an average grade of 67.19% lead @ 79.3% recovery, producing 1,440 dmt of concentrate.

    0.6719 * 0.793 * 1440 = 767 tonnes of metal lead.

    Zinc concentrate production is exceeding forecast with an average grade of 46.62% zinc @ 87.5% recovery, producing 4,589 dmt of concentrate.

    0.4662 * 0.875 * 4589 = 1871 tonnes of metal zinc.


    The question is, were the April figures DMT or WMT?

    Hopefully all these updates will become standardised so comparisons can be made. I also wait for the production guidelines and settlement date.

    Btw, I could be wrong with my interpretation so DYOR.

    ;-)
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.