Can any other holders confirm my interpretation of the 2015/2016 Production targets for metal (rather than concentrate) from today's announcement:
"The Mt Garnet concentrator will maintain current concentrate production levels throughout 2015/2016":
Lead = 7,906 t ( .6821*.775*1245= monthly production 688 t * 12 months)=
Copper = 2,347t (.2512*.741*1051= monthly production 195 t *12 months)
Zinc = 30,079t (.475*.915*5789=monthly production 2506t *12 months)
2014/15 production targets for metal was:
|
Column 1 |
Column 2 |
1 |
copper |
2500t |
2 |
lead |
6000t |
3 |
zinc |
25000t |
|
Column 1 |
Column 2 |
1 |
silver |
209000 |
Thanks & cheers