Hmm, an update!
DFS November, after the FEECO pilot kiln results completed in September.
903 dmt of copper concentrate.
861 dmt of lead concentrate.
4526 dmt of zinc concentrate!!! (Nice recovery rates of 85.52%)
Oh, and there's gold and silver in the lot, too.
All going as planned at this point.
Add to My Watchlist
What is My Watchlist?