It’s has been slowly increasing since the solid construction reports started. It may drift for a bit then when the power station complete, power on and crusher operating it will be a huge rerate. 30c by Xmas and at least 35 when the wheels are turning. No idea where it wi be when the gold is pouring! Positive position to be in with RED.
- Forums
- ASX - By Stock
- Ann: Construction at King of the Hills continuing as planned
It’s has been slowly increasing since the solid construction...
-
- There are more pages in this discussion • 175 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
34.5¢ |
Change
-0.030(8.00%) |
Mkt cap ! $2.414B |
Open | High | Low | Value | Volume |
36.0¢ | 36.0¢ | 34.5¢ | $4.345M | 12.35M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
52 | 1163108 | 34.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 790581 | 59 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
54 | 1101593 | 0.345 |
29 | 943065 | 0.340 |
17 | 1046861 | 0.335 |
24 | 743110 | 0.330 |
13 | 900131 | 0.325 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 756700 | 60 |
0.355 | 756366 | 29 |
0.360 | 594121 | 32 |
0.365 | 244350 | 9 |
0.370 | 544409 | 8 |
Last trade - 13.22pm 07/11/2024 (20 minute delay) ? |
Featured News
VAU (ASX) Chart |