just had a quick look, contingency was 23 mil back on 17th March now sitting at 19mil so 4 mil has been dropped out.
If it had been mentioned I must have missed it, will need to look at the financials again.
KOTH project and prestrip is the same at $207 mil.
Loan term over 5.75 years.