Assume very roughly that overheads / processing costs eat 50% of sales, then total EBITDA is around $15M for 49.6% to AM7 of $7.5M (free cash flow) annualized. At 3x $7.5M EV is $22.5M. This excludes value of all other assets. IMHO should be currently valued at around $40M or 49 cents per share. Pending release of PFS and ongoing work at Bitterwasser (which has very significant upside). Please note that these are very rough guesstimate (do your own research). Good luck to all longs.
- Forums
- ASX - By Stock
- AM7
- Ann: Construction funding secured for Swanson Tantalum Project
Ann: Construction funding secured for Swanson Tantalum Project, page-5
-
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AM7 (ASX) to my watchlist
|
|||||
Last
4.2¢ |
Change
0.002(5.00%) |
Mkt cap ! $4.916M |
Open | High | Low | Value | Volume |
4.2¢ | 4.2¢ | 4.2¢ | $630 | 15K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 71848 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 3501 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 71848 | 0.039 |
1 | 108027 | 0.037 |
3 | 260000 | 0.033 |
1 | 220000 | 0.032 |
2 | 52255 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 3501 | 1 |
0.042 | 99998 | 1 |
0.045 | 150000 | 1 |
0.055 | 100000 | 1 |
0.065 | 200000 | 1 |
Last trade - 09.59am 03/07/2024 (20 minute delay) ? |
Featured News
AM7 (ASX) Chart |
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online