What they need to do is to dig 2 trenches in parallel in each...

  1. 10,545 Posts.
    lightbulb Created with Sketch. 303
    What they need to do is to dig 2 trenches in parallel in each location, one to 2.7m and one to 5.5m and test the flow in each. This will allow them to determine the flow rates in the lower half 2.7m to 5.5m which has lower specific yield. They should really do this in all locations imo as it will allow them to better optimise their trench network design.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
10.0¢
Change
0.005(5.26%)
Mkt cap ! $38.17M
Open High Low Value Volume
10.0¢ 10.0¢ 9.9¢ $11.97K 119.8K

Buyers (Bids)

No. Vol. Price($)
1 10000 9.6¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 194212 3
View Market Depth
Last trade - 15.11pm 28/07/2025 (20 minute delay) ?
AMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.