The big ticks we need now are the IDC loan for US$14mill and maybe up to US$6mill from the current cr would be good. That would get us to US$20mill without diluting excessively. That would then leave up to a further US$6mill to source either from other lenders or, at worst, another cr later at hopefully a higher sp.
Require $40m Aussie for construction if CAPEX doesn't increase and delays and interest in arrears to IDC for both loans - inflation running at nearly 20% in Angola and interest rates yet to be determined if loans are approved
Then running costs for 2024 of $10m or so
So how can what you state will cover above - let alone wait for another CR later
interest at 3 months in arrears for loans is itself in the millions
So misleading and 100% wrong imo
IMO - will require far more than what you state and that's if production is in 2024 - extremely unlikely
@chuk
- Forums
- ASX - By Stock
- Ann: Continuation of Suspension
The big ticks we need now are the IDC loan for US$14mill and...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNB (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $47.58M |
Open | High | Low | Value | Volume |
5.5¢ | 5.5¢ | 5.5¢ | $1.293K | 23.51K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 99000 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 43955 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 99000 | 0.054 |
3 | 205832 | 0.053 |
3 | 73865 | 0.052 |
6 | 118968 | 0.051 |
6 | 314701 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 43955 | 1 |
0.056 | 200000 | 1 |
0.057 | 50000 | 1 |
0.058 | 160499 | 2 |
0.059 | 50000 | 1 |
Last trade - 10.04am 28/05/2024 (20 minute delay) ? |
Featured News
MNB (ASX) Chart |