A++++ performance score.
Great to see HGO competently achieving the UG delivery.
Interesting to compare the Economic Study assumptions with the actual performance.
Copper Produced:
239 + 589 + 719 = 1,547t produced.
If Feb is counted as half a month the study forecast for the first 2.5 months is 175 + 475 + 525 = 1,175 tonnes actual production is 32% up on forecast.
If Feb is counted as a whole month, the forecast for the first 3 months is 350 + 600 + 550 = 1,500 t which is about Spot on forecast.
Feed Grade
Study had the feed grade ranging from 1% to 1.4%
Actual feed grade a tad less than 1%
Seems like they may have dropped the cut off grade given the current price environment.
Copper Recovery
the study forecast was for recovery of 93.1% at a feed grade of 1.05%
Figure 41 in the study indicates that the recovery percentage should continue to improve.
Milled tonnes:
The study forecast for the first three months was 50,000 + 60,000 + 61500 = 172,500 t
If feb is counted as a half month the forecast would be 25,000 + 55,000 + 60,750 = 140,750 t
Actual achieved 33,605 + 70,788 + 81,426 = 186,344 t.
That puts Feb up 34% March up 29% and April up 34%
- Forums
- ASX - By Stock
- Ann: Continued Ramp Up In Production at Kanmantoo
A++++ performance score.Great to see HGO competently achieving...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.7¢ |
Change
0.006(7.41%) |
Mkt cap ! $182.1M |
Open | High | Low | Value | Volume |
8.2¢ | 8.9¢ | 8.2¢ | $1.586M | 18.53M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 827233 | 8.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.7¢ | 104544 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 827233 | 0.086 |
4 | 386879 | 0.085 |
5 | 287868 | 0.084 |
7 | 1490310 | 0.083 |
13 | 970865 | 0.082 |
Price($) | Vol. | No. |
---|---|---|
0.087 | 113878 | 2 |
0.088 | 867280 | 7 |
0.089 | 772708 | 4 |
0.090 | 907709 | 9 |
0.091 | 220918 | 4 |
Last trade - 15.01pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
8.7¢ |
  |
Change
0.006 ( 7.41 %) |
|||
Open | High | Low | Volume | ||
8.3¢ | 8.9¢ | 8.3¢ | 8246777 | ||
Last updated 15.13pm 15/05/2024 ? |
Featured News
HGO (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online