A++++ performance score.
Great to see HGO competently achieving the UG delivery.
Interesting to compare the Economic Study assumptions with the actual performance.
Copper Produced:
239 + 589 + 719 = 1,547t produced.
If Feb is counted as half a month the study forecast for the first 2.5 months is 175 + 475 + 525 = 1,175 tonnes actual production is 32% up on forecast.
If Feb is counted as a whole month, the forecast for the first 3 months is 350 + 600 + 550 = 1,500 t which is about Spot on forecast.
Feed Grade
Study had the feed grade ranging from 1% to 1.4%
Actual feed grade a tad less than 1%
Seems like they may have dropped the cut off grade given the current price environment.
Copper Recovery
the study forecast was for recovery of 93.1% at a feed grade of 1.05%
Figure 41 in the study indicates that the recovery percentage should continue to improve.
Milled tonnes:
The study forecast for the first three months was 50,000 + 60,000 + 61500 = 172,500 t
If feb is counted as a half month the forecast would be 25,000 + 55,000 + 60,750 = 140,750 t
Actual achieved 33,605 + 70,788 + 81,426 = 186,344 t.
That puts Feb up 34% March up 29% and April up 34%
- Forums
- ASX - By Stock
- Ann: Continued Ramp Up In Production at Kanmantoo
A++++ performance score.Great to see HGO competently achieving...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
-0.002(1.82%) |
Mkt cap ! $169.5M |
Open | High | Low | Value | Volume |
8.3¢ | 8.5¢ | 8.1¢ | $252.4K | 3.048M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 708347 | 8.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 513200 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 708347 | 0.081 |
15 | 837600 | 0.080 |
2 | 537987 | 0.079 |
6 | 512358 | 0.078 |
2 | 503900 | 0.077 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 513200 | 2 |
0.084 | 894958 | 3 |
0.085 | 454014 | 5 |
0.086 | 1166071 | 7 |
0.087 | 380000 | 4 |
Last trade - 16.10pm 28/05/2024 (20 minute delay) ? |
|
|||||
Last
8.3¢ |
  |
Change
-0.002 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
8.4¢ | 8.4¢ | 8.2¢ | 980410 | ||
Last updated 15.54pm 28/05/2024 ? |
Featured News
HGO (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online