Here you go.
(1) Processing 3,462,500 tonnes of ore at a grade of 0.86 % would likely fill the plant and deliver free cash flow of $178m, 8.5c/share.
(2) The April production was an annual rate of 985,752 tonnes at a grade of 0.98% and 90% recovery which would deliver free cash flow on an annualised basis of $55m,2.7c/share, if costs are 5% higher than the ES study assumptions and Gold recovery stays at ES levels 55% and not the 85% they are hopeful of getting to..
- Forums
- ASX - By Stock
- Ann: Continued Ramp Up In Production at Kanmantoo
Here you go.(1) Processing 3,462,500 tonnes of ore at a grade of...
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $171.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 107361 | 8.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.9¢ | 12543 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 167361 | 0.082 |
4 | 703836 | 0.081 |
2 | 800000 | 0.080 |
6 | 2163116 | 0.079 |
3 | 338000 | 0.078 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 22762 | 2 |
0.080 | 19078 | 2 |
0.081 | 97712 | 2 |
0.082 | 269198 | 7 |
0.083 | 629573 | 6 |
Last trade - 10.02am 05/06/2024 (20 minute delay) ? |
|
|||||
Last
8.1¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
8.1¢ | 8.1¢ | 8.1¢ | 239299 | ||
Last updated 10.10am 05/06/2024 ? |
Featured News
HGO (ASX) Chart |
Day chart unavailable
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online