Ann: Continued Wellfield Expansion at Alta Mesa Uranium Project, page-2

  1. 194 Posts.
    lightbulb Created with Sketch. 38
    • Wellfield development continues to show positive results with a total of 32 wells, 15 extractors and 17 injectors installed and operational with uranium-bearing solution scheduled to be piped to the Alta Mesa CPP by April 23, 2025. This current rate of under two days per installed well is the best in enCore’s history at Alta Mesa
    • Alta Mesa wellfield optimization training and updated procedures are on-going. The enhanced procedures are positively impacting the productive life of existing wellfields and is expected to enhance future wellfield operations and total uranium capture.
    • Please refer to enCore’s announcement dated April 22, 2025 for further information


    seems to be going well
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$1.76
Change
-0.145(7.61%)
Mkt cap ! $738.5M
Open High Low Value Volume
$1.85 $1.87 $1.73 $52.02M 28.88M

Buyers (Bids)

No. Vol. Price($)
15 44513 $1.76
 

Sellers (Offers)

Price($) Vol. No.
$1.76 45292 26
View Market Depth
Last trade - 12.19pm 29/07/2025 (20 minute delay) ?
BOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.