with the calibre of NVA frontline staff I would hope that this is 'all in a days work'. I am not a GEO
but any practical person would assume that the resource model builds as assay reports are assimilated.
When the target is reached the announcement would be made. It could come after the next lot of
assays or we may not reach the target till the last planned drill is assayed. I have every confidence in
our front line staff................Dale Shultz as 'Competent Person' gives me confidence.
- Forums
- ASX - By Stock
- Ann: Continuous Gold Mineralisation from Surface at Korbel
with the calibre of NVA frontline staff I would hope that this...
- There are more pages in this discussion • 224 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.0¢ |
Change
0.010(3.70%) |
Mkt cap ! $59.63M |
Open | High | Low | Value | Volume |
28.0¢ | 28.0¢ | 28.0¢ | $6K | 21.42K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 27.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.0¢ | 4233 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 0.270 |
1 | 20000 | 0.265 |
3 | 150028 | 0.260 |
2 | 40000 | 0.255 |
4 | 64502 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.285 | 39000 | 1 |
0.290 | 7241 | 1 |
0.305 | 39644 | 4 |
0.310 | 9826 | 1 |
0.315 | 7626 | 3 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
28.0¢ |
  |
Change
0.010 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
27.0¢ | 28.0¢ | 27.0¢ | 5170 | ||
Last updated 11.32am 03/05/2024 ? |
Featured News
NVA (ASX) Chart |