PRODUCTION!!!!
Potential DSO Opportunity at Grants. The continuity and expanded size of high grade spodumene mineralisation drilled at Grants strengthens the case for the potential for early DSO production from the Finniss Lithium Project, starting at the Grants Prospect. Grants is located 500m from the sealed highway which connects to the Project to nearby Port Darwin (Figure 4). Port Darwin is a multiuser port with bulk loading and container shipping facilities with spare capacity and is Australia’s closest port to Asia. The Finniss Project’s potential logistics chain is comparable with some of the best spodumene projects being developed in Australia. Once all assay results have been received from the current drilling programme at Grants, Core will consider a Mining Study on the Grants Pegmatite to assess the potential for early development of a DSO spodumene mining project at Grant exporting via the Port of Darwin.
- Forums
- ASX - By Stock
- CXO
- Ann: Continuous High Grade Spodumene in Phase 2 RC Drilling
Ann: Continuous High Grade Spodumene in Phase 2 RC Drilling, page-6
-
- There are more pages in this discussion • 345 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.005(5.00%) |
Mkt cap ! $224.3M |
Open | High | Low | Value | Volume |
9.8¢ | 10.8¢ | 9.6¢ | $1.222M | 11.93M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
50 | 3180868 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 1951653 | 28 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
38 | 2496361 | 0.100 |
2 | 205000 | 0.099 |
5 | 566000 | 0.098 |
8 | 628505 | 0.097 |
7 | 228295 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 1413592 | 22 |
0.115 | 2898274 | 14 |
0.120 | 1818087 | 28 |
0.125 | 2230473 | 36 |
0.130 | 2987563 | 33 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |