Opaline,
I think you are right, there are a number of obstacles to deal with,
5" drill pipe,
Bottom hole assembly consisting of 6 1/2" drill collars and then a couple of 8 1/2" stabilisers, maybe a motor and then the drill bit. The larger diameter stabiliser and bit can't be washed over.
I guess the course of action is washover the drill pipe and possibly the drill collars to recover as much as possible, this is faster than drilling a new side track hole, then try and yank the remainder but it is probably stack fast with angular chips of granite wedging it, so after a few attempts set a wedge and drill a new hole.
- Forums
- ASX - By Stock
- Ann: Cooper Basin Project Update
-
- There are more pages in this discussion • 75 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(11.1%) |
Mkt cap ! $2.904M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $102 | 20.62K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
30 | 11076670 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2512320 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
30 | 11076670 | 0.004 |
19 | 7608024 | 0.003 |
7 | 3769586 | 0.002 |
5 | 10300004 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2512320 | 5 |
0.006 | 3856161 | 7 |
0.007 | 894338 | 3 |
0.008 | 849165 | 4 |
0.009 | 709176 | 1 |
Last trade - 15.34pm 23/07/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online