ASX ANNOUNCEMENT 05 FEBRUARY 2009Cooper Basin Project...

  1. 2,877 Posts.
    lightbulb Created with Sketch. 24
    ASX ANNOUNCEMENT 05 FEBRUARY 2009
    Cooper Basin Project Update

    Closed Loop Flow Test Update
    Geodynamics is pleased to announce that the closed loop test is ongoing. The test is 75% complete with 31 days of the required 42 days of brine circulation now complete. The flow test is expected to be completed by mid to late February 2009.
    Upon completion of this test, the results will be subject to a period of external review and validation. A successful validation will mark the completion of Stage One of the Company’s business plan i.e. ‘Proof of Concept’.

    Savina 1 Drilling Progress
    Geodynamics reports that a program of actions to release the stuck drill pipe is in progress. The technique currently being employed is to wash over sections of the
    stuck pipe (a process that involves ‘swallowing’ the drill pipe with a larger pipe to force it away from the side of the hole) and then remove the released portions of the
    pipe. This technique has been successful to date with approximately 400 metres of drill pipe being released.
    The recovery actions are ongoing and the company is confident of recovering the remainder of the stuck drill pipe.
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.001(20.0%)
Mkt cap ! $4.357M
Open High Low Value Volume
0.5¢ 0.6¢ 0.4¢ $4.406K 856.7K

Buyers (Bids)

No. Vol. Price($)
14 5274884 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 6058246 9
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.