this was covered in Q&A session.
The work is going to schedule, but a little delayed because of weather, but still on schedule.
They have completed the lower plugs on 3 wells - (3 to go??).
Evidently, it is the work on the lower sections of the wells which carry the most risk.
The rig then circles back, and completes the work on the upper section of the wells.
The commissioning is still expected to be completed in early May.
As far as I heard the cost is still within the $240m-$280m. They have contingency in that figure - I think they said maybe 10% contingency? There were more comprehensive questions about $$ but I missed the answer.
COE still needs to complete the rehab on the umbilicals etc by 2026, and that cost will be on top of the $240m budget. They will use a rig which is already in the area at that time.
- Forums
- ASX - By Stock
- Ann: Cooper Energy H1 FY24 results presentation
this was covered in Q&A session. The work is going to schedule,...
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $567.6M |
Open | High | Low | Value | Volume |
21.5¢ | 21.8¢ | 21.0¢ | $719.7K | 3.350M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 809305 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.5¢ | 201241 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 799832 | 0.210 |
15 | 679707 | 0.205 |
19 | 2136660 | 0.200 |
9 | 497688 | 0.195 |
8 | 742145 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.215 | 215507 | 9 |
0.220 | 532832 | 18 |
0.225 | 353889 | 9 |
0.230 | 991574 | 8 |
0.235 | 639912 | 14 |
Last trade - 11.46am 08/07/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |