COE 2.22% 23.0¢ cooper energy limited

this was covered in Q&A session. The work is going to schedule,...

  1. 8,513 Posts.
    lightbulb Created with Sketch. 2748
    this was covered in Q&A session.
    The work is going to schedule, but a little delayed because of weather, but still on schedule.
    They have completed the lower plugs on 3 wells - (3 to go??).
    Evidently, it is the work on the lower sections of the wells which carry the most risk.
    The rig then circles back, and completes the work on the upper section of the wells.

    The commissioning is still expected to be completed in early May.

    As far as I heard the cost is still within the $240m-$280m. They have contingency in that figure - I think they said maybe 10% contingency? There were more comprehensive questions about $$ but I missed the answer.

    COE still needs to complete the rehab on the umbilicals etc by 2026, and that cost will be on top of the $240m budget. They will use a rig which is already in the area at that time.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
0.005(2.22%)
Mkt cap ! $607.2M
Open High Low Value Volume
22.5¢ 23.0¢ 22.5¢ $183.4K 810.0K

Buyers (Bids)

No. Vol. Price($)
2 491238 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 644269 13
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
22.5¢
  Change
0.005 ( 0.04 %)
Open High Low Volume
22.5¢ 22.8¢ 22.5¢ 131657
Last updated 15.57pm 24/05/2024 ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.