Logical to update all the data and make sure that Rover 1 is real and is there (although I expect it could do with some infill drilling), what I want to know is how much deeper drilling there has been done in that are between Rover 4 and Jupiter, because if there are several blind additional deposits following that plunge direction from Rover 4 to Jupiter and Rover 1 then that would completely and utterly change the economics of the project from "wishful thinking" and pie in the sky stuff to something much more likely to be developed. Remembering that these Tennant Ck Ironstone hosted things often come in multiple pods or groups.
They may as well drill a few deep "geotechnical" holes along the axis of the proposed development drive so there are no major surprises when they do the underground development....
- Forums
- ASX - By Stock
- Ann: Copper at Rover 4 Adds to Plans at Rover 1
Logical to update all the data and make sure that Rover 1 is...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CST (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.2¢ |
Change
0.001(1.23%) |
Mkt cap ! $19.83M |
Open | High | Low | Value | Volume |
8.2¢ | 8.2¢ | 8.2¢ | $3.272K | 39.90K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 44876 | 8.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.8¢ | 34414 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 44876 | 0.082 |
1 | 100000 | 0.078 |
1 | 29850 | 0.077 |
1 | 319863 | 0.075 |
2 | 17521 | 0.066 |
Price($) | Vol. | No. |
---|---|---|
0.088 | 34414 | 1 |
0.090 | 250000 | 1 |
0.125 | 35001 | 1 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 12.54pm 19/07/2024 (20 minute delay) ? |
Featured News
CST (ASX) Chart |