Down-hole electromagnetic (DHEM) surveys have been planned within drill-holes
HMDD012 and HMDD015 to test for sulphide mineralisation up to ~200m from each drillhole. These surveys are scheduled to commence around the middle of August subject to crew
availability and will take approximately 6-10 days to complete. Off-hole conductors identified
by the DHEM surveys will be targeted for further drilling.
We are waiting for the outcome, the above was taken from the announcement
- Forums
- ASX - By Stock
- Ann: Copper Potential Confirmed at Hamilton
Down-hole electromagnetic (DHEM) surveys have been planned...
Featured News
Add AQD (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.72M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 163757 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.011 |
5 | 1030250 | 0.010 |
6 | 519379 | 0.009 |
5 | 2871222 | 0.008 |
1 | 120000 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 163757 | 1 |
0.014 | 70759 | 2 |
0.016 | 175000 | 1 |
0.017 | 1000000 | 1 |
0.018 | 109304 | 1 |
Last trade - 16.11pm 08/05/2024 (20 minute delay) ? |
Featured News
AQD (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online