AQD 0.00% 1.3¢ ausquest limited

Down-hole electromagnetic (DHEM) surveys have been planned...

  1. 26,423 Posts.
    lightbulb Created with Sketch. 641
    Down-hole electromagnetic (DHEM) surveys have been planned within drill-holes
    HMDD012 and HMDD015 to test for sulphide mineralisation up to ~200m from each drillhole. These surveys are scheduled to commence around the middle of August subject to crew
    availability and will take approximately 6-10 days to complete. Off-hole conductors identified
    by the DHEM surveys will be targeted for further drilling.

    We are waiting for the outcome, the above was taken from the announcement

 
watchlist Created with Sketch. Add AQD (ASX) to my watchlist
(20min delay)
Last
1.3¢
Change
0.000(0.00%)
Mkt cap ! $10.72M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 200000 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 163757 1
View Market Depth
Last trade - 16.11pm 08/05/2024 (20 minute delay) ?
AQD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.