HGO 1.47% 6.7¢ hillgrove resources limited

Ann: Copper Production Commences at Kanmantoo Mine, page-13

  1. 4,781 Posts.
    lightbulb Created with Sketch. 2233
    I have read that the real shortage starts after 2025.
    I think that the transition to the electrification of everything may go a bit slower than planned , better prices will come but the timing is still not sure .
    The conversion to renewables is a huge financial and logistical challenge and there is a lot of pushback from the sceptics .
    With a lot of big mines needing to mine lower grade ore and the cost of new mines escalating I don't think the price will crash .

    I am glad they went down the equity route in spite of the big dilution .
    We are producing while others are struggling to find loan money and partners to build plant and get into production .
    Last edited by jophda: 12/02/24
 
watchlist Created with Sketch. Add HGO (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
-0.001(1.47%)
Mkt cap ! $140.4M
Open High Low Value Volume
6.9¢ 7.0¢ 6.7¢ $243.4K 3.548M

Buyers (Bids)

No. Vol. Price($)
4 513146 6.7¢
 

Sellers (Offers)

Price($) Vol. No.
6.9¢ 711343 7
View Market Depth
Last trade - 15.59pm 04/07/2024 (20 minute delay) ?
HGO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.