HGO 2.67% 7.3¢ hillgrove resources limited

Ann: Copper Production Commences at Kanmantoo Mine, page-13

  1. 4,761 Posts.
    lightbulb Created with Sketch. 2231
    I have read that the real shortage starts after 2025.
    I think that the transition to the electrification of everything may go a bit slower than planned , better prices will come but the timing is still not sure .
    The conversion to renewables is a huge financial and logistical challenge and there is a lot of pushback from the sceptics .
    With a lot of big mines needing to mine lower grade ore and the cost of new mines escalating I don't think the price will crash .

    I am glad they went down the equity route in spite of the big dilution .
    We are producing while others are struggling to find loan money and partners to build plant and get into production .
    Last edited by jophda: 12/02/24
 
watchlist Created with Sketch. Add HGO (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
-0.002(2.67%)
Mkt cap ! $152.9M
Open High Low Value Volume
7.7¢ 7.7¢ 7.3¢ $396.6K 5.318M

Buyers (Bids)

No. Vol. Price($)
4 363689 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.5¢ 199949 1
View Market Depth
Last trade - 16.10pm 11/06/2024 (20 minute delay) ?
Last
7.5¢
  Change
-0.002 ( 0.40 %)
Open High Low Volume
7.7¢ 7.7¢ 7.3¢ 2094107
Last updated 15.59pm 11/06/2024 ?
HGO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.