because if RCR can't resume drilling program that means they (CGR) can't start their drilling program too, and if the road from Alice Springs is still closed
then rigs cannot be delivered to the site, and if CGR is using the same DD/RC rigs then they may have to wait till RCR finish drilling.
- Forums
- ASX - By Stock
- RCR
- Ann: Copper Sulphides Intercepted at West Arunta
Ann: Copper Sulphides Intercepted at West Arunta, page-140
-
-
- There are more pages in this discussion • 216 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RCR (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $41.80M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 193726 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.5¢ | 147501 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 140726 | 0.150 |
13 | 484103 | 0.145 |
11 | 301811 | 0.140 |
7 | 467385 | 0.135 |
20 | 646091 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.145 | 147501 | 6 |
0.150 | 803874 | 14 |
0.155 | 1578074 | 8 |
0.160 | 458163 | 8 |
0.165 | 386623 | 9 |
Last trade - 09.56am 08/07/2024 (20 minute delay) ? |
Featured News
RCR (ASX) Chart |
Day chart unavailable