Hi damianwrx,
SM did mention that they are looking at a varied model to the scoping study where potentially the camp set up and the crushing plant would be funded and operated by third parties thereby taking those sections out of our balance sheet and also off the funding requirement. This is the same situation as the planned transport (trucking model) where a third party contractor would be involved.
By the way these trucks that are currently being considered will haul a minimum 150 tonnes per load on 4 trailers with complete combination about 60 metres in overall length.
The video of the Noosa presentation is now available on a number of platforms including Facebook as well as direct email from RHK, well worth a look IMO.
- Forums
- ASX - By Stock
- Ann: Corporate Presentation - Noosa Mining Conference
Hi damianwrx,SM did mention that they are looking at a varied...
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RHK (ASX) to my watchlist
(20min delay)
|
|||||
Last
90.0¢ |
Change
0.030(3.45%) |
Mkt cap ! $179.8M |
Open | High | Low | Value | Volume |
90.0¢ | 90.0¢ | 87.0¢ | $16.01K | 18.12K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5800 | 86.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
90.0¢ | 2799 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5800 | 0.860 |
1 | 1177 | 0.850 |
1 | 1000 | 0.840 |
1 | 327 | 0.835 |
1 | 1225 | 0.815 |
Price($) | Vol. | No. |
---|---|---|
0.900 | 2799 | 2 |
0.960 | 10000 | 1 |
0.970 | 20990 | 1 |
0.980 | 20200 | 2 |
1.000 | 20000 | 1 |
Last trade - 12.55pm 03/05/2024 (20 minute delay) ? |
Featured News
RHK (ASX) Chart |