The DFS ramp-up was 6 months to MSP nameplate production. As per yesterday the current plan is another 6 months to 100% throughput and the MSP will obviously have to follow whatever timeline is set by the WCP and how many HMC shipments are planned.
Any mention of monazite rare earths is noise. They don't produce a monazite product and pretending zircon concentrate "containing" monazite is a drawcard is pure spin. Would be lucky to produce 50t of "contained" monazite in a year.
The market is really hanging out for the quarterly cashflow report. Q1 they said they had $50m and the majority of CAPEX had been paid. What is the majority of $340m? How much more is left to pay? What that $50m looks like at the end of Q2 is the big unknown.
- Forums
- ASX - By Stock
- STA
- Ann: Corporate Presentation - Noosa Mining Investor Conference
Ann: Corporate Presentation - Noosa Mining Investor Conference, page-19
-
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online