Corporate and Updated DFS Metrics
▪ ROBUST METRICS: The DFS delivered an NPV10 (100% project interest) of A$3.62Bn (A$1.58Bn after tax)
▪ Impressive IRR 55% (33.2% after tax) based on a CAPEX of A$545M inclusive of a A$49M contingency
(100% interest).
▪ Combined Indicated and Measured Resource of 269 million tonnes is possibly the worlds
largest mineable primary spodumene resource
▪ The study estimates a 20 year mine life on 93 Mt Proved and Probable Reserve at 1.58% Li2O
producing 13.72Mt @ 6.1% Li Concentrate and 0.9 Mt of Primary Lithium Sulphate.
▪ The 93 Mt Ore Resource is only 35% of the current Roche Dure geological resources.
- Forums
- ASX - By Stock
- AVZ
- Ann: Corporate Presentation
Ann: Corporate Presentation, page-4
- There are more pages in this discussion • 94 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)