EGR 1.03% 9.8¢ ecograf limited

Just so everyone is clear, what exactly are you trying to tell...

  1. 165 Posts.
    Just so everyone is clear, what exactly are you trying to tell us all? That there is and won't be a way to transport product from the mine to port once construction starts? Is that what you really think / hope?

    Let's look at the facts.
    The bridge is under construction.
    There is a Chinese construction company working there already and from your Facebook research the foundations have been set already. So heavy industrial vehicles and equipment have access to the site.
    As part of the construction, a temporary bridge with a 100 tonne has been built already to facilitate construction of the bridge.

    So hypothetically if the bridge isn't completed in 2 years, do you really believe KNL will not be able to get product through? Do you really think discussions wouldn't be in place for use of the temporary construction bridge? If not, what are you trying to warn us from?
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.