Had $4.7M at end of last quarter.
Spent $1.6M in the last quarter.
Spent $4.8M in the last 3 quarters (avg. $1.6M per qtr).
Going off the above, they have enough for 3 qtr's from the end of the last qtr (ie. enough until the end of this year).
Keep in mind that they've been drilling and drilling and drilling over the last 3 qtr's, so if anything, the spend likely to be lower than higher (obviously depends on how much drilling they do each quarter, but doubt they will/can do more than they have in the last 3 quarters).
Cheers,
GB.
- Forums
- ASX - By Stock
- MAG
- Ann: Corvette Drilling and Metallurgy Update
Ann: Corvette Drilling and Metallurgy Update, page-32
-
-
- There are more pages in this discussion • 211 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAG (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.003(8.57%) |
Mkt cap ! $14.59M |
Open | High | Low | Value | Volume |
3.5¢ | 3.8¢ | 3.5¢ | $7.661K | 201.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 366257 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 45000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 366257 | 0.038 |
2 | 101700 | 0.036 |
3 | 189598 | 0.035 |
2 | 340000 | 0.030 |
1 | 50000 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 45000 | 1 |
0.047 | 97589 | 2 |
0.049 | 10000 | 1 |
0.050 | 47583 | 1 |
0.054 | 377810 | 2 |
Last trade - 14.49pm 14/11/2024 (20 minute delay) ? |
Featured News
MAG (ASX) Chart |