CPO's Lana Morina ore body actually starts from surface (breccia pipes outcrop at surface) not 50m depth. The first CPO drill intercept begins at 50m downhole because the drill comes in at an angle from outside the ore body and intercepts part way down the ore body. Look at the section drawing in the announcement.
- Forums
- ASX - By Stock
- CPO
- Ann: CPO intersects copper sulphide over 200m in first drill hole
Ann: CPO intersects copper sulphide over 200m in first drill hole, page-66
-
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NVA
Nova locks in NASDAQ US market listing at a value of only US$3.3M as ASX gets quieter and quieter
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?
Add CPO (ASX) to my watchlist
|
|||||
Last
4.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.772M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 180576 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 126537 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 180576 | 0.047 |
1 | 150000 | 0.046 |
1 | 300000 | 0.043 |
2 | 300000 | 0.042 |
3 | 237500 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 126537 | 1 |
0.050 | 793184 | 2 |
0.051 | 100000 | 1 |
0.054 | 82500 | 1 |
0.055 | 878636 | 2 |
Last trade - 07.00am 29/07/2024 (20 minute delay) ? |
Featured News
CPO (ASX) Chart |
Day chart unavailable