CPO 0.00% 4.4¢ culpeo minerals limited

CPO's Lana Morina ore body actually starts from surface (breccia...

  1. 1,742 Posts.
    lightbulb Created with Sketch. 106
    CPO's Lana Morina ore body actually starts from surface (breccia pipes outcrop at surface) not 50m depth. The first CPO drill intercept begins at 50m downhole because the drill comes in at an angle from outside the ore body and intercepts part way down the ore body. Look at the section drawing in the announcement.
 
watchlist Created with Sketch. Add CPO (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.000(0.00%)
Mkt cap ! $7.276M
Open High Low Value Volume
4.4¢ 4.5¢ 4.4¢ $64.39K 1.463M

Buyers (Bids)

No. Vol. Price($)
2 875887 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 116209 1
View Market Depth
Last trade - 14.50pm 21/06/2024 (20 minute delay) ?
CPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.