OEL 9.09% 1.2¢ otto energy limited

Ann: Credit Facility Amendment, page-22

  1. 933 Posts.
    lightbulb Created with Sketch. 104
    OEL are already hedged ~ 70% of current production which will exceed 1900 bpd.

    As mentioned above, I' picking the 1900 boepd is aimed at ensuring OEL cannot sell off SM71 or Lightning without tripping that covenant. as both are contributing around half of current boepd production. Given the asset sales strategy has been introduced since the original loan agreement, and GC21 hasn't performed, Macbank will have introduced the 1900 boded clause to effectively hold covenant over both producing assets in exchange for extending the timeline for Tranche A2.
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $57.54M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $1 92

Buyers (Bids)

No. Vol. Price($)
7 5214781 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 960978 4
View Market Depth
Last trade - 10.06am 06/09/2024 (20 minute delay) ?
OEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.