As far as I know, the mining permit has been granted. A distinction is also made between open-cast and underground mining.
Currently, 80 million tons of mineral raw materials are mined in Austria every year, in addition to raw materials from non-mining extraction.
An environmental compatibility certificate is required if the area outside the mine is larger than 1 hectare, which is considered a production site.
However, CRML remains below this requirement and uses less land.
Another major advantage, in addition to the massive reduction in production costs, is that the converter is being built in Saudi Arabia.
- Forums
- ASX - By Stock
- Ann: Critical Metals Corp. F-4 is Effective
As far as I know, the mining permit has been granted. A...
-
-
- There are more pages in this discussion • 151 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
-0.002(3.77%) |
Mkt cap ! $71.30M |
Open | High | Low | Value | Volume |
5.3¢ | 5.5¢ | 5.1¢ | $51.73K | 975.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1155385 | 5.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 257307 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1155385 | 0.051 |
3 | 345000 | 0.050 |
2 | 31103 | 0.049 |
3 | 38000 | 0.048 |
4 | 250297 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 257307 | 2 |
0.055 | 263798 | 1 |
0.056 | 20000 | 1 |
0.057 | 240874 | 1 |
0.059 | 25000 | 2 |
Last trade - 15.59pm 21/06/2024 (20 minute delay) ? |
Featured News
EUR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online